|
CI Cable Identifier
09.21.07 Product news
|
|
A completely new technology to identify cables. This unit replaces the AL 60 system.

|
 |
 
|
 |
|
Centrix with protocoling
06.22.07 Product news
|
|
Today more and more jobs and applications require a reporting by a protocol or test document after finishing the activities.
Read more about the Centrix protocoling.

|
 |
 
|
 |
|
The high Power Burn Option for the Centrix
02.15.07 Product news
|
|
For PILC but especially for the location of “Wet Faults” the burning is still very important. The burning with high current is still the only really usable technology.
To provide this as an option for the new Centrix fault location system, some completely new technologies were developed.

|
 |
|
 |
|
Hints for the pinpointing
07.11.06 Hints and tricks
|
|
Did you know, that it is not required to do the pinpointing procedure acoustically?
Just try to locate the fault without using the headset. You will be surprised, how easy this works.

|
 |

|
 |
|
Centrix - The new generation of fault location systems
07.24.06 Product news
|
|
With the Centrix, you will experience a system, which contains everything in technology and know how that is available for fault location on power cables. SebaKMT has the whole system reduced into one operational element. In combination with the interactive support on the display the system guides you straight forward to your target.

|
 |
![[Translate to English:] [Translate to English:]](typo3temp/pics/6f40939890.jpg)  Control Panel of the new Centrix Test Van System |
 |
|
More security and dependability in low-voltage cable mounting
07.03.06 Product news
|
|
You know certainly this situation:
With assemblies in to disconnect low-voltage cables it comes especially with missing marking on cabels, or however, also by inattentiveness with the assembly to possible exchanges of phase and neutral wire.

|
 |

|
 |
|
Successfull start of the new SPG 40
05.08.06 Detail news
|
|
Just one year after the official launch of the new fault location system SPG 40 more than 15 units have been delivered.
Consequential implementation of experience in the field and from the operation of existing systems as the world wide well known Unisat resulted in the development of a new und progressive concept of the SPG 40.

|
 |

|
 |
Displaying results 1 to 7 out of 11
|